2017

During the last year we worked on the refurbishment of the kitchen, which had become unusable as the floor had collapsed.

We were lucky to be given a set of kitchen units, an electric hob and oven, so the first main task was taking out the brick wall, which separated the kitchen from the internal office.

The ceiling was replaced, new electric cables installed, together with a new hand washing basin.

Everything was painted, new worktops fitted, new flooring laid and tiling fitted above the worktops.

We are now fully compliant for cooking and serving food.

We threw all caution to the wind and let Grant loose with the sledgehammer.
Wall coming down!
Peter hard at work.
Flooring is now repaired, and the walls have had a first coat of paint.
Electrics and water installed. Taking shape!